View Issue Details

IDProjectCategoryView StatusLast Update
0001353T99X171.00 SKB EagleHWpublic2024-06-11 09:25
Reporter(PM) Carey LuAssigned To(ALTech) Lonnie Kim Due Date2024-06-11 10:25
PrioritynormalSeveritys6-featureReproducibilityhave not tried
Status closedResolutionnot fixable 
Summary0001353: Eagle 2nd Source-PHY IC/ E-FUSE/ BT/ Reset IC
DescriptionPer talked in the meeting, to lower the impact of material shortage and long L/T, Fii suggested to introduce the 2nd source for below items.
The comparison sheet is attached here for your reference.
Need ALT's help to check the file and confirm if Fii can proceed to 2nd source introduction process?
As for the introduction/testing schedule, after receiving your instruction to go, Fii will discuss internally and provide the schedule in this Mantis later.
=================================================
    Main Source -----> 2nd Source
1) Realtek RTL8211F-CG ---> Motorcomm YT8531C
2) TI TPS25200DRVR ---> Toshiba TCKE712BNL
3) CYPRESS CYW20704UA2KFFB1G ---> AMPAK W511A
4) Fiti FP6809-29CS3GTR ---> 3Peak TPV809S-3TR
==================================================
Thank you.
TagsNo tags attached.
Attach Tags

Users monitoring this issue

User List (ALTech) SH Son , (ALTech) Sun Choul Joung , (ALTech) SY Yoon , (HW) Cooper Kung , (HW) Sean Chiang , (PM) Dennis Lu , (PM) Sheila Tu , (RD) Jay Lin , (SW) Jacky Chiang , (SW) Kerwin Chen

Activities

(PM) Carey Lu

2021-09-17 11:11

no access  

(PM) Carey Lu

2021-09-24 11:43

no access   ~0008274

Please see attached for the draft schedule and kindly let us know if any concerns.
Also, we need ALT to confirm officially in order to start the phase in process. As the supply status is "not" getting better, please help to check as soon as possible.
Thank you.

(ALTech) SY Yoon

2021-09-24 13:39

developer   ~0008279

@Carey Lu and @Sean Chiang,

We think that we changes lots component for material shortage.
Is there any additional HW change to reduce material cost ?
I think that you would like to change many major components and it need SW change too.
So if you have any changes to reduce cost, it can be introduce this time.
If you have any other HW or SW changes then please let us know.

As you mentioned in the meeting, please let us know who will pay it for new certification and test ?

(ALTech) Lonnie Kim

2021-10-05 19:09

developer   ~0008384

Hi, Carey

Regarding BT module(W511A), I think below items would be need.
1) KC certification renewal
2) BT BQB renewal
3) SKB BMT & QA
In addition, please provide SoC information of BT module.

Best regards

Lonnie Kim

(PM) Carey Lu

2021-10-07 09:49

no access   ~0008400

HI Lonnie,

As the COB design belongs to AML. We are checking with AML if they can provide the datasheet.
I will let you know once we get the feedback. Thank you.

BR,
Carey

(PM) Carey Lu

2021-10-07 11:17

no access   ~0008403

Hi Mr.Yoon,

@syyoon

I've noticed that you had confirmed K18X001 2nd source introduction.
(Also, I've checked with Sean, currently we have no other materials need to phase in due to cost reduction.)
Thus, except for BT module, can you help to confirm the introduction of the rest three 2nd source suggestions for Eagle?
As the global supply shortage issue is getting worse and worse, phase in 2nd source can help to mitigate the material shortage risk.
Moreover, as for Eagle, following Fii internal rules, it requires only 4pcs DUT for reliability test. (+100pcs control run in VN factory)
Please kindly help to feedback ALT's decision this week. Thank you.
 
 Main Source -----> 2nd Source
1) Realtek RTL8211F-CG ---> Motorcomm YT8531C (Not QVL)
2) TI TPS25200DRVR ---> Toshiba TCKE712BNL
3) Fiti FP6809-29CS3GTR (EOL) ---> 3Peak TPV809S-3TR


BR,
Carey Lu

(ALTech) SY Yoon

2021-10-08 17:24

developer   ~0008415

Hi Carey Lu,

We need to provide new HW and SW to SKB for their test.
Normally we provide samples as follows :
    1. BMT samples - 20 pcs
    2. SKB QA samples - 10 pcs for function test and 5 for aging test
    3. ALT samples - 5 for develop and debug

And we would like to ask you how many ECO you plan.
If we apply all new components at once, then we can provide additional sample at once.
But if you plan to introduce new components separately, then you should provide samples whenever you introduce new components.
And please let us know as follows :
     1. Which test will you do for each component change ?
         How many q'ty will you use for each test?
      2. How will you handle BQB/KC fee ?
      3. How will you start to introduce 2nd source ?
           PIN-to-PIN components will be the first priority ?
           Or all the components will be introduced in separately ?
I can agree based on your proposal.
So could you provide it as soon as possible ?

(PM) Carey Lu

2021-10-08 18:53

no access   ~0008416

Hi Mr. Yoon,

For the samples, I need to discuss with Tiffanie first.
1. Which test will you do for each component change ?
   How many q'ty will you use for each test? ---> @Sean, need your help to check this item. Thanks.
2. How will you handle BQB/KC fee ? --> Tiffanie will discuss with your business team.
3. How will you start to introduce 2nd source ?
   PIN-to-PIN components will be the first priority ?
   Or all the components will be introduced in separately ?
-->
Our plan is to arrange 2 times introduction.
1st round (pin to pin):
3peak TPV809S-3TR
Motorcomm YT8531C

2nd round (re-layout):
Toshiba TCKE712BNL
Ampak W511A

BR,
Carey Lu

(ALTech) Lonnie Kim

2021-10-15 13:35

developer   ~0008467

Hi, Carey

I added your R&D validation test items of each components.

Best regards

Lonnie Kim

(ALTech) Sun Choul Joung

2021-10-15 13:36

developer   ~0008468

Hi Carey Lu
The unit price and delivery time are reduced when using the 2nd source e-fuse as an alternative as shown in the picture .
Please review after confirmation.
2nd e -fuse.png (73,533 bytes)   
2nd e -fuse.png (73,533 bytes)   

(PM) Carey Lu

2021-10-15 14:37

no access   ~0008469

Hi Sun Choul Joung, @schtwo

I am confused with the purpose of your request.
Do you mean you would like to suggest another solution other than Toshiba TCKE712BNL for the EFUSE shortage?
One more question, for the discrete you provided, did ALT already test the function?
Thank you.

Hi Cooper, @831842

Can you help to check if there's any concern for the R&D validation test items provided by Lonnie? Thank you.

Best Regards,
Carey Lu

(ALTech) Sun Choul Joung

2021-10-19 09:04

developer   ~0008486

Hi Carey Lu

The OCP( Over current protection) should use fuse like picture .
The other company is using it . but Functional verification required it
it's my suggestion, so decide on Foxconn

Thank yoy
Jung

(PM) Carey Lu

2021-10-19 10:04

no access   ~0008488

HI Sean,

Need your help to check Sun Choul Joung's suggestions.
Thank you.

BR,
Carey Lu

(ALTech) Lonnie Kim

2021-10-19 14:21

developer   ~0008492

Hi, Carey Lu

I have question about BT module.
Is it KC certificated?
If yes, KC certification might be very simple.
If no, KC certification might be full package(fully test).

Best regards

Lonnie Kim

(PM) Carey Lu

2021-10-19 17:03

no access   ~0008496

HI Lonnie,

After checked with PL, AMPAK W511A module doesn't have KC certification.

BR,
Carey Lu

(ALTech) Lonnie Kim

2021-10-19 19:15

developer   ~0008500

Hi, Carey Lu

Okay, could you check if they plan to certificate KC?

Best regards

Lonnie Kim

(PM) Carey Lu

2021-10-20 15:08

no access   ~0008508

HI Lonnie,

Currently, they don't have plan to apply the KC certification.

BR,
Carey Lu

(PM) Carey Lu

2021-10-26 16:48

no access   ~0008587

Hi Mr. Yoon,

The supply status of CYPRESS BT CYW20704 & ETH PHY Realtek RTL8211F-CG is getting worse and worse.
So, we need your help to discuss internally and feedback whether you agree to phase in or not ASAP. (Also need your help to push ALT business team to feedback the 2nd source phase in cost issue.)

For non pin to pin 2nd source, we plan to arrange 2 rounds build as SWAN did.
Therefore, as you've requested 40pcs sample, please check the schedule attached and help to suggest when to arrange the sample shipment?
    1. BMT samples - 20 pcs --> send after 1st or 2nd build?
    2. SKB QA samples - 10 pcs for function test and 5 for aging test --> send after 1st or 2nd build?
    3. ALT samples - 5 for develop and debug --> send after 1st or 2nd build?

Moreover, based on the schedule, I'd like to check if we start to phase in non P2P 2nd source, when will you apply KC certification and start BMT test and how long will it take?
Thank you.

BR,
Carey

(ALTech) SY Yoon

2021-10-28 15:44

developer   ~0008616

Hi Ms. Carey Lu

I think you will introduce 2nd source with 2 phases. One is for PIN-TO-PIN and the other is for NON-PIN-TO-PIN.
Sample delivery.
      1st Round : We need samples for BMT and QA. And we also need for our development
                           Before start BMT and QA, we should provide our test result to SKB.
                            SKB will decide test item when they start BMT based on their SW release schedule.
                            If we change PHY IC, then we should test their Network environment test.
                            It should be started before BMT. They will start BMT If there is no issue on Network test.
                            So we need our development samples ASAP include HW EMI Test.
      2nd Round : We need samples for BMT and QA. It is same situation as above.
                            For KC certification, we can start with final HW. So if you provide it when you are ready of Final HW.
                            Normally KC needs 4 week if there is any issue. We already get KC certification. So we don't need full KC certification.

If you want to introduce all components changes at once, then you can provide these samples for BMT and QA at once.

SKB BMT & QA Schedule : SKB decide it based on their new SW release schedule even though we don't need SW changes.
                                               Normally new product need 35-working days. But I think we may reduce days for our 2nd source introduction.
                                               But it should be decided by SKB. They will decide how much SW and HW are changed.
If you need any explanation, then let's have con-call.

(ALTech) Lonnie Kim

2021-11-08 17:17

developer   ~0008687

Hi, Ms. Carey

ALT recommended below 4 parts for E-fuse instead of TI & Toshiba.
Please review datasheet.

1. Max1756x(Maxim)
2. LX8233(Microsemi)
3. AQ32919(Awinic)
4. NIS6150(Onsemi)+Zener

You can choose it.

Best regards

Lonnie Kim
MAX17561-MAX17563.pdf (726,908 bytes)
NIS6150-D.pdf (297,838 bytes)

(PM) Carey Lu

2021-11-08 17:44

no access   ~0008689

HI Sean & Cooper,

@826508 @831842

Please help to check the request from ALT, thank you!

Best Regards,
Carey Lu

(HW) Cooper Kung

2021-11-11 16:02

developer  

GMT G5288B efuse.pdf.pdf (1,308,692 bytes)

(HW) Cooper Kung

2021-11-11 16:02

developer   ~0008711

Hi Lonnie,

For the suggestions you provide, we will refer to the solutions of ON and MAXIM because they are QVL recognized by FXN. However, GMT, which is also recognized by FXN, provides the following solution. It seems that there are advantages from Cost and L/T. PM and sourcer are asking GMT about this solution now

Thanks,
Cooper

(ALTech) Lonnie Kim

2021-11-12 08:55

developer   ~0008717

Hi, Cooper

I think GMT solution is good, so you can choose it.
Please go next step.

Best regards

Lonnie Kim

(ALTech) Lonnie Kim

2021-11-16 09:24

developer   ~0008735

Hi, Carey

Could you update status of Eagle's 2nd source ?

Best regards

Lonnie Kim

(PM) Carey Lu

2021-11-16 17:19

no access   ~0008737

HI Lonnie,

Maxim and Onsemi feedback to our sourcer today, however, they requested us to provide the correct MPN.
Can you help to double check?

1) Maxim provided below list. Please check which one is the right one?
MAX17561AUD+
 
MAX17561AUD+T
 
MAX17561EVKIT#
 
MAX17562AUD+
 
MAX17562AUD+T
 
MAX17562DEMBD#
 
MAX17563AUD+
 
MAX17563AUD+T
 
MAX17567ATP+
 
MAX17567ATP+T

2) For Onsemi, the vendor asked us to provide the correct MPN.--> pls help to check

Best Regards,
Carey Lu

(ALTech) SY Yoon

2021-11-16 18:25

developer   ~0008738

Hi Ms. Carey Lu,

I think you already decided to use GMT solution.
But why are you check Maxim and Onsemi ?
Is there any issue to use GMT solution ?

(PM) Carey Lu

2021-11-16 20:01

no access   ~0008740

Hi Mr. Yoon,

Per ALT's request, we asked our buyers to check all the suggested parts at the same time as backup solution.
Currently, the LT for GMT is 210days. (Still under negotiation between buyers and vendor.)
So, please help to feedback the correct MPN.

(ALTech) Sun Choul Joung

2021-11-17 08:43

developer   ~0008741

Hi Ms. Carey Lu.
The MPN are MAXIM MAX17561AUD+T , Onsemi NIS6150MT2TXG .

Best regards
jung

(PM) Carey Lu

2021-11-17 18:16

no access  

(PM) Carey Lu

2021-11-17 18:16

no access   ~0008744

HI Mr.Yoon & Lonnie,

Please help to check attached file for Eagle 2nd source update. Thanks.

(ALTech) Lonnie Kim

2021-11-17 18:50

developer   ~0008745

Hi, Carey

Regarding BT module, actual delivery schedule depends on PO quantity and release time.
I heard they already have some stocks for Smart3 for Intekdigital.

Best regards

Lonnie Kim

(PM) Carey Lu

2021-12-07 15:43

no access   ~0008851

HI Mr. Yoon,

In the meeting last Friday, ALT side feedback to provide the decision on whether to use Ampak or Movon for BT module 2nd source solution today(Dec. 7th).
Thus, pls kindly inform us ALT's decision regarding this issue so we can move on to the next step.
Thank you.

BR,
Carey

(ALTech) SY Yoon

2021-12-07 18:59

developer   ~0008855

Hi Ms. Carey Lu,

We had plan to meet MOVON yesterday. But it delayed.
We had a meeting with MOVON today. And they will check the leadtime with Movon.
Movon is checking with Realtek about chip delivery.
I will comeback soon with decision. It maybe tomorrow.

(HW) Cooper Kung

2021-12-14 17:47

developer   ~0008922

Hi Lonnie,
attached is 2nd 3Peak TPV809S-3TR reliability test report,
the result is pass,

Thanks
Cooper

(PM) Carey Lu

2021-12-24 11:31

no access   ~0009108

HI Mr. Yoon,

Please see attached for Eagle 2nd source introduction schedule adjusted based on sample status.
Need your help to check
1) Fiti phase in sample DUT Qty for ALT
2) ALT would like to introduce ETH PHY & BT together due to KC certification. However, the Realtek RTL8211F-CG ETH PHY supply status is really critical(even worse in 2022), so we suggest to introduce it first instead of doing it together with Ampak BT(takes more time). Thus, please also check the schedule and consider about this.

Thanks,
Carey

(ALTech) SY Yoon

2021-12-29 16:54

developer   ~0009170

Hi Ms. Carey Lu,

As you know, we should apply KC when we introduce new BT Module.
We need 4 more sample unit for KC. Can you provide 4 samples more ?

Best Regards,
SuhYoung YOON

(PM) Carey Lu

2021-12-29 17:27

no access   ~0009173

HI Mr. Yoon,

Can you calculate again the total sample ALT/SKB needed for 1) ETH PHY 2nd source 2) BT 2nd source?
I will discuss with Tiffanie for this.
Thanks!

Best Regards,
Carey Lu

(PM) Carey Lu

2022-01-10 17:04

no access   ~0009313

HI Mr. Yoon,

I'd like to double check for 2nd source BT Ampak W511 introduction SW change, do we need to support all old version RCU or only latest version RCU(BA02)?
Thank you.

Best Regards,
Carey Lu

(ALTech) SY Yoon

2022-01-12 18:15

developer   ~0009331

Hi Carey Lu,

I cannot guarantee new STBs will not use with RCU BA02.
New STBs will be provide with BA03, but if the customer lost RCU then SKB provide various RCUs.
So our STBs can support various RCU BA01, BA02, BA03, BT10, BT11 and old version of RCU.
I think we should not have any restriction to use various RCUs that SKB has been used.

Best Regards,
SuhYoung YOON

(RD) Jay Lin

2022-01-27 16:15

developer   ~0009387

Hi Lonnie,

Please find the attachment of Eagle schematic with 2nd source BT solution.

(HW) Cooper Kung

2022-01-27 17:27

developer   ~0009389

Hi Lonnie,

Motorcomm YT8531C ethernet PHY 2nd test status as below:
1. RGMII Timing test : test pass as attached
2. Ethernet SI test : 10M/100M/1G testing
3. EMI test: arrange on 2/9
4. Reliability test : arrange on middle of Feb

(HW) Cooper Kung

2022-02-07 09:25

developer   ~0009395

Hi Lonnie,

please find the attached of Eagle 2nd verification test report:
1. Motorcomm/YT8531C Ethernet SI test report 10M/100M/1G
2. 3Peak/TPV809S-3TR control run report

let us know if 3Peak/TPV809S-3TR can be introduced

(ALTech) Lonnie Kim

2022-02-10 16:36

developer   ~0009426

Hi, Cooper Kung

Regarding Reset IC, we confirmed to apply mass production.
Regarding ethernet phy, please refer and test attached test item at 10T.

Best regards

Lonnie Kim
10T test item.pptx (214,190 bytes)

(HW) Cooper Kung

2022-02-16 16:17

developer   ~0009457

Hi Lonnie,

please refer attached for 10T test item
Lan - 10 - 02152022.pdf (4,028,764 bytes)

(RD) Jay Lin

2022-03-14 08:59

developer   ~0009597

Hi Lonnie,

Please find the attachment of Eagle 2nd source change list including Ethernet PHY and BT solutions.

(ALTech) Sun Choul Joung

2022-03-22 08:55

developer   ~0009664

Hi, jay Lin

Attached are the EMI test report for 2nd source
- Motorcomm/YT8531C Ethernet

test result are pass.

Thanks !
SMART3_YT8531C.pdf (261,602 bytes)

(PM) Sheila Tu

2022-03-25 18:18

developer   ~0009709

Hi Mr. Yoon,

I attached the control run report from VN factory for Motorcomm introduction.

(ALTech) Lonnie Kim

2024-06-11 09:25

developer   ~0015978

CLosed

Issue History

Date Modified Username Field Change
2021-09-17 11:11 (PM) Carey Lu New Issue
2021-09-17 11:11 (PM) Carey Lu File Added: SKB OTT 2nd comparison with PHY, e-Fuse, BT, reset IC.xlsx
2021-09-17 11:13 (PM) Carey Lu Issue Monitored: (PM) Carey Lu
2021-09-17 11:17 (PM) Carey Lu Assigned To => (ALTech) Lonnie Kim
2021-09-17 11:17 (PM) Carey Lu Status new => assigned
2021-09-17 11:18 (PM) Carey Lu Issue Monitored: (HW) Sean Chiang
2021-09-17 11:18 (PM) Carey Lu Issue Monitored: (HW) Cooper Kung
2021-09-17 11:18 (PM) Carey Lu Issue Monitored: (PM) Sheila Tu
2021-09-17 11:20 (PM) Carey Lu Issue Monitored: (ALTech) SY Yoon
2021-09-17 11:21 (PM) Carey Lu Issue Monitored: (ALTech) SH Son
2021-09-17 11:22 (PM) Carey Lu Issue Monitored: (SW) Jacky Chiang
2021-09-17 11:22 (PM) Carey Lu Issue Monitored: (RD) Jay Lin
2021-09-24 11:43 (PM) Carey Lu File Added: Phase in schedule-V1-210924.xlsx
2021-09-24 11:43 (PM) Carey Lu Note Added: 0008274
2021-09-24 13:39 (ALTech) SY Yoon Note Added: 0008279
2021-10-05 19:09 (ALTech) Lonnie Kim Note Added: 0008384
2021-10-07 09:49 (PM) Carey Lu Note Added: 0008400
2021-10-07 11:17 (PM) Carey Lu File Added: K18 2nd source ALT confirmation.PNG
2021-10-07 11:17 (PM) Carey Lu Note Added: 0008403
2021-10-08 17:24 (ALTech) SY Yoon Note Added: 0008415
2021-10-08 18:53 (PM) Carey Lu Note Added: 0008416
2021-10-15 13:35 (ALTech) Lonnie Kim File Added: SKB OTT 2nd comparison with PHY, e-Fuse, BT, reset IC_ALT feedback_211015.xlsx
2021-10-15 13:35 (ALTech) Lonnie Kim Note Added: 0008467
2021-10-15 13:36 (ALTech) Sun Choul Joung File Added: 2nd e -fuse.png
2021-10-15 13:36 (ALTech) Sun Choul Joung Note Added: 0008468
2021-10-15 14:37 (PM) Carey Lu Note Added: 0008469
2021-10-19 09:04 (ALTech) Sun Choul Joung Note Added: 0008486
2021-10-19 10:04 (PM) Carey Lu Note Added: 0008488
2021-10-19 14:21 (ALTech) Lonnie Kim Note Added: 0008492
2021-10-19 17:03 (PM) Carey Lu Note Added: 0008496
2021-10-19 19:15 (ALTech) Lonnie Kim Note Added: 0008500
2021-10-20 15:08 (PM) Carey Lu Note Added: 0008508
2021-10-26 16:48 (PM) Carey Lu File Added: Eagle 2nd source schedule.pptx
2021-10-26 16:48 (PM) Carey Lu Note Added: 0008587
2021-10-28 15:44 (ALTech) SY Yoon Note Added: 0008616
2021-11-08 17:17 (ALTech) Lonnie Kim File Added: MAX17561-MAX17563.pdf
2021-11-08 17:17 (ALTech) Lonnie Kim File Added: Microsemi_LX8233_Datasheet.pdf
2021-11-08 17:17 (ALTech) Lonnie Kim File Added: DS_AW32919_Over-Voltage Protection Load Switch with Surge Protection_EN_....pdf
2021-11-08 17:17 (ALTech) Lonnie Kim File Added: NIS6150-D.pdf
2021-11-08 17:17 (ALTech) Lonnie Kim Note Added: 0008687
2021-11-08 17:44 (PM) Carey Lu Note Added: 0008689
2021-11-11 16:02 (HW) Cooper Kung File Added: GMT G5288B efuse.pdf.pdf
2021-11-11 16:02 (HW) Cooper Kung Note Added: 0008711
2021-11-12 08:55 (ALTech) Lonnie Kim Note Added: 0008717
2021-11-15 19:14 (PM) Carey Lu Issue Monitored: (PM) Christine Huang
2021-11-16 09:24 (ALTech) Lonnie Kim Note Added: 0008735
2021-11-16 17:19 (PM) Carey Lu Note Added: 0008737
2021-11-16 18:25 (ALTech) SY Yoon Note Added: 0008738
2021-11-16 20:01 (PM) Carey Lu Note Added: 0008740
2021-11-17 08:14 (ALTech) SY Yoon Issue Monitored: (ALTech) Sun Choul Joung
2021-11-17 08:43 (ALTech) Sun Choul Joung Note Added: 0008741
2021-11-17 18:16 (PM) Carey Lu File Added: ALT)Eagle 2nd source status update-211117.xlsx
2021-11-17 18:16 (PM) Carey Lu Note Added: 0008744
2021-11-17 18:50 (ALTech) Lonnie Kim Note Added: 0008745
2021-12-07 15:43 (PM) Carey Lu Note Added: 0008851
2021-12-07 18:59 (ALTech) SY Yoon Note Added: 0008855
2021-12-14 17:47 (HW) Cooper Kung File Added: Reliability test report for BFX-AT100_3PEAK reset IC_2021-12-14.pdf
2021-12-14 17:47 (HW) Cooper Kung Note Added: 0008922
2021-12-23 18:05 (PM) Carey Lu Severity s2-severe => s6-feature
2021-12-23 18:05 (PM) Carey Lu Description Updated
2021-12-24 11:31 (PM) Carey Lu File Added: Eagle 2nd source schedule-ALT.pptx
2021-12-24 11:31 (PM) Carey Lu Note Added: 0009108
2021-12-29 16:54 (ALTech) SY Yoon Note Added: 0009170
2021-12-29 17:27 (PM) Carey Lu Note Added: 0009173
2022-01-10 17:04 (PM) Carey Lu Note Added: 0009313
2022-01-10 17:05 (PM) Carey Lu Issue Monitored: (SW) Kerwin Chen
2022-01-12 18:15 (ALTech) SY Yoon Note Added: 0009331
2022-01-27 16:15 (RD) Jay Lin File Added: s905x2_ver1_20211227_2_w511.pdf
2022-01-27 16:15 (RD) Jay Lin Note Added: 0009387
2022-01-27 17:27 (HW) Cooper Kung File Added: T99X171T00 introduce YT8531C RGMII Timing test report.doc
2022-01-27 17:27 (HW) Cooper Kung Note Added: 0009389
2022-02-07 09:25 (HW) Cooper Kung File Added: T99X171.00 Control run U401 reset IC Test Yield Rate report.pptx.pptx.pptx
2022-02-07 09:25 (HW) Cooper Kung File Added: YT8531C Ethernet SI test report.7z
2022-02-07 09:25 (HW) Cooper Kung Note Added: 0009395
2022-02-10 16:36 (ALTech) Lonnie Kim File Added: 10T test item.pptx
2022-02-10 16:36 (ALTech) Lonnie Kim Note Added: 0009426
2022-02-16 16:17 (HW) Cooper Kung File Added: Lan - 10 - 02152022.pdf
2022-02-16 16:17 (HW) Cooper Kung Note Added: 0009457
2022-03-14 08:59 (RD) Jay Lin File Added: Eagle 2nd source change list.xlsx
2022-03-14 08:59 (RD) Jay Lin Note Added: 0009597
2022-03-22 08:55 (ALTech) Sun Choul Joung File Added: SMART3_YT8531C.pdf
2022-03-22 08:55 (ALTech) Sun Choul Joung Note Added: 0009664
2022-03-25 18:11 (PM) Sheila Tu Issue End Monitor: (PM) Carey Lu
2022-03-25 18:11 (PM) Sheila Tu Issue End Monitor: (PM) Christine Huang
2022-03-25 18:12 (PM) Sheila Tu Issue Monitored: (PM) Dennis Lu
2022-03-25 18:18 (PM) Sheila Tu File Added: BFX-AT100 Control Run New SW and Motorcomm 2nd source_0322.pdf
2022-03-25 18:18 (PM) Sheila Tu Note Added: 0009709
2024-06-11 09:25 (ALTech) Lonnie Kim Status assigned => closed
2024-06-11 09:25 (ALTech) Lonnie Kim Resolution open => not fixable
2024-06-11 09:25 (ALTech) Lonnie Kim Due Date => 2024-06-11 10:25
2024-06-11 09:25 (ALTech) Lonnie Kim Note Added: 0015978